Construction of Amir Abad Power Plant began In 2007 to provide the energy needed for the Special Economic Zone of Amir Abad Port. Due to the urgent need of the area, the power plant was under construction in two phases. The first phase consists of Gas Engines and the second phase consists of two Gas Turbines.

Objectives

  • To supply part of national electricity demand
  • Production and delivery of reliable electricity under competitive conditions to the special economic zone of Amirabad port and industries

Location

Near Foulad Sazan Damavand Factory, AmirAbad Free Zone, Behshahr, Mazandaran, Iran On Map

Project Phases

Specifications of Project Phases

AmirAbad 1

  • Efficiency: 42 %
  • Availability: 94%
  • Capacity under ISO conditions:

    8 MW

  • Type:

    Gas Engine

  • Number and type of units:

    1 Units of TCG2032V16 Gas Engine

  • Capacity of each unit:

    4 MW

AmirAbad 2

  • Efficiency: 25.5 %
  • Availability: 98%
  • Capacity under ISO conditions:

    50 MW

  • Type:

    Simple Cycle

  • Number and type of units:

    2 unit of John Brown F5

  • Capacity of each unit:

    25 MW