Annual General Assembly Meeting of Mah Taab Kahnouj Company was Held
The Annual General Assembly Meeting of Mah Taab Kahnouj Power Generation company was held at 10 am on Monday, May 14, 2018, with 95.5% of the sharehol...
The Annual General Assembly Meeting of Mah Taab Kahnouj Power Generation company was held at 10 am on Monday, May 14, 2018, with 95.5% of the sharehol...
The contract for the construction of a 99.2 MW wind farm was signed between TizBaad Niroo as an investor and Safa Niku as an EPC subcontractor in Mah ...
The contract for the construction of a 61.2 MW wind farm was signed between Arian Mah Baad as an investor and Safa Niku as an EPC subcontractor, atten...